After 4 months of construction, the HS-55 cutter suction dredger is finished building in the workshop, and ready for factory testing. The CSD is scheduled to be dispatched to Alexandria Egypt next month.
>Two sets of HS-55 series CSD ready for shipment to Egypt
>Hansel Marine Raises the Bar in Egypt, Two Units HS-55 CSDs Launched