The factory test of HS-55 CSD has been carried out at the shipyard wharf. The HS-55 CSD is designed and built for our client in Zhejiang China with a capacity of abt 600m3 per hour solid soil and 1500m discharging length. The CSD will be dispatched to Ningbo area by road and come into operation in the inner water of Ningbo in next month.